- Joined
- Aug 31, 2013
- Messages
- 374
GC is Lemartec
Good luck! Working on two jobs with them now.
GC is Lemartec
Idk if you are talking to me but if so.....Like the condos he tried to get built in Tampa?Should have contracted Trump to get it built.
It would be done in six months.
Under budget.
Would you like it better if it was constructed overnight, in secret, the doors wouldn't work on opening day, and the roof crashed in a few years? Then the builders and their fans could admire it and tell us how great it is and why it should be "tweaked." ;-)
Lady: "He's a lovely dog."
Garbage Truck Driver: "He's dead lady, the truck just flattened him."
Buyers still feel burned by Donald Trump after Tampa condo tower failure | Tampa Bay Times
Sent from my SM-N910T using Tapatalk
Idk if you are talking to me but if so.....Like the condos he tried to get built in Tampa?Should have contracted Trump to get it built.
It would be done in six months.
Under budget.
Would you like it better if it was constructed overnight, in secret, the doors wouldn't work on opening day, and the roof crashed in a few years? Then the builders and their fans could admire it and tell us how great it is and why it should be "tweaked." ;-)
Lady: "He's a lovely dog."
Garbage Truck Driver: "He's dead lady, the truck just flattened him."
Buyers still feel burned by Donald Trump after Tampa condo tower failure | Tampa Bay Times
Sent from my SM-N910T using Tapatalk
If you're going to do it - do it right.
Trump didn't do that - five other builders screwed the pooch. They just paid Trump a couple million to put his name on it.
But Trump wasn't in the financing, the construction, the selling - none of it. They wanted to hang his name on it - paid for that right - and their deal collapsed with the real estate market crash. Just bad timing.
Hopefully they bury Shalala in the foundation wearing a Trump hat.
IPF photos for an overview of the site. Photos made from 5th floor deck of the new Lennar Medical Center.
View attachment 45272
View attachment 45273
View attachment 45274
Should have contracted Trump to get it built.
It would be done in six months.
Under budget.
yet one of the default talking points when someone (usually on their way out of the area after losing at life here) wants to ***** about the region is how it's sooooooooo overdeveloped.
Hopefully they bury Shalala in the foundation wearing a Trump hat.
View attachment 45274
Serious question: Is that a historically protected goal post that they can't tear down? Will it remain on the outside of the new IPF or will it be under the roof?
so..
1. The current untouched area will all be IPF, right?
2. I'm guessing the grounds currently being bulldozed is getting some fresh playing surface? Grass or turf?
View attachment 45274
Serious question: Is that a historically protected goal post that they can't tear down? Will it remain on the outside of the new IPF or will it be under the roof?
I could be wrong but isn't that goalpost supposed to be 120yards away from the IPF. Looks like everything they cleared out is going to be Outside the IPF and they left the IPF turf intact.
View attachment 45274
Serious question: Is that a historically protected goal post that they can't tear down? Will it remain on the outside of the new IPF or will it be under the roof?
I could be wrong but isn't that goalpost supposed to be 120yards away from the IPF. Looks like everything they cleared out is going to be Outside the IPF and they left the IPF turf intact.
I don't know what you think you are looking at in that picture, but the photo appears to have been taken from the top of the parking garage, looking due west, at Chuck Cobb Stadium, which will probably be where the team practices during construction.
The Hecht Athletic Center would be just to the right, out of frame, beyond the north part of the track. The cleared land immediately in the foreground will be the staging area for construction, and the construction will happen to the right side of the picture as well.
I'm sure they will restore the sod for this particular field when construction is done.
This is the only side of the IPF on which they could stage construction, as the other 3 sides of the IPF are: a canal; the Wellness Center; and the Hecht.