Gocanes is DBC. Has to be
EPIC LMAO M3N , that SFF I LIKE THE SHOT .
Hey boys, I'm happy my sales numbers are sweet , change orders and revisions are my BEST FRIENDS call me all the names everyone wants KACHING $$ LMAO.
GOCANES
Gocanes is DBC. Has to be
LOL - and the cycle begins anew.
that is nice , have to admit it.
GOCANES
ICANEDOIT,
I know I said I would just watch but there are some here that really want honest updates here's another one ready.
I just received rev. #6 worth $10,000.00 for a couple additional panel boards, copper bus mounting straps for existing switch boards,additional 400 amp 65 kaic rated sensitron breaker ,solid core ct meter sensor, external SPD 100 ka TVS, 45 KVA xfrmr and 9 position meter racks.
Figure and estimated 4 weeks for manufacturing and 3-4 days shipping common carrier, keep in mind this is ONLY the electrical side , plumbing ,HVAC and so on has there revisions also to deal with.
Just sharing with everyone.
GOCANES
Fall camp is supposed to start Aug 4th. Think we have everything complete by then just in case we need to practice indoors?UPDATE,
Just checked with Siemens , looks likes like "estimated" ship date is 7/24 on switch-gear revision #6 which is pretty darn good also figure 3-4 days for common carrier to deliver.
If all holds true ,I can have this on IPF site by 7/31 installed in the coming weeks then EC can do a "temp to test" and prep.for final for grand opening in August as mentioned by others earlier in this thread.
GOCANES
No offense but sometime you respond like a little kid bro. Don't take these posters serious...8/4 LMAO , all I know is what I'm sharing on my end of material needed to open the IPF per approved drawings and revisions , I recommend anyone wanting to know more then I do in going back through this long thread and find the people in the know whom spiritedly told me I was crazy and ask them.
I'm sure they are confident in there claims of opening on schedule.
GOCANES
UPDATE,
Just checked with Siemens , looks likes like "estimated" ship date is 7/24 on switch-gear revision #6 which is pretty darn good also figure 3-4 days for common carrier to deliver.
If all holds true ,I can have this on IPF site by 7/31 installed in the coming weeks then EC can do a "temp to test" and prep.for final for grand opening in August as mentioned by others earlier in this thread.
GOCANES
I´m sure the GC and the client (UM) are delighted that some of the details of the construction are being leaked out on The Interwebs. I appreciate the inside information but not sure this is good for your business or the client. Irregardless, keep the updates a-coming.
Ultimately it just needs to repel lightning and have turf. Looks pretty close. Some lights to see the field and it ready for practice.
Tell that to The City of Coral Gables building and zoning department .
GOCANES
I'm wondering where OCC is with all this happening
GOCANES