Miami Director of Athletics Blake James: Indoor Practice Facility Goal to Open in 2018

An indoor practice facility remains at the top of the list,” James said. “An announcement will be coming soon. I will continue to say that. Unfortunately we don’t have it yet today, but we’re finalizing some details and we’ll have a naming gift secured here in the near future and that’s something I hope we have in place for the April ’18 season.


“That’s a project that we continue to push on full-go. To get those facilities you have to have a passionate fan base and one that’s able to step forward. We’re getting it on the indoor practice facility, but we’re also seeing it on a daily basis”


James announced they have over 36,000 season-ticket holders with less than 1,000 in the lower bowl. James believes they will reach the 40,000-mark for the season.


Miami’s home stadium shared with the Miami Dolphins, New Miami Stadium, has undergone $5 million renovations in the offseason.


“I’m confident it will be one of the best in the country and will be hosted future Super Bowls, college football championships, and home to an NFL team,” James said “To have a stadium of that level to be there for our program is something that’s a real win for us.”


James is expected to be ready for the Hurricanes’ home opener on Sept. 3 against Florida A&M.


“Based on the comments the Dolphins have made publicly I feel confident,” James said. “We have a back-up plan in place, but we are confident we will be in that stadium on Sept. 3.”


James declined to name the stadium for the back-up plan, but one is in place and fans would get two-week notice (which would be Aug.20) if a change will be made.
 
Advertisement
Matt porter said it on Twitter that IPF won't be full field, Which would be a bummer.

There were two plans, one to build an 80yd IPF where the turf field is, or build a full size facility where the tennis center is.
 
Advertisement
Matt porter said it on Twitter that IPF won't be full field, Which would be a bummer.

There were two plans, one to build an 80yd IPF where the turf field is, or build a full size facility where the tennis center is.

Just seems odd that we wouldn't build a full length IPF. I'm interested to see the plans of the extended weight room and new coaches room.
 
Advertisement
[TWEET]764573244817047552[/TWEET]

giphy.gif
 
What has been questioned in this thread was the Blake statement that was with regard to the stadium at 5 million, that is obviously wrong. The cost of the IPF, from what I read was not mentioned. That said, $5 million sounds light for the IPF, but might be in the ballpark for the shell. HVAC, FP, FF&E, power & light, plumbing, etc. are probably in addition to that. Would love to see some plans or at least a rendering, anyone?

Sent from my SCH-I545 using Tapatalk
 
Back
Top