Search results

  1. PortvilleCane

    IPF- Progress Pics (OP Updated July 10)

    LOL you filled orders drawn up and specified by the electrical design engineers hired by the Architect of record. As in the plans called for a specific surge suppressor based on design criteria and you looked in an electrical component catalog, copied the specifications of said component...
  2. PortvilleCane

    IPF- Progress Pics (OP Updated July 10)

    The work being done may have a couple of different occupancy permits. 1 for athletic facility with no habitable space and 1 for the coaches offices and habitable space where they may not be complete with the elec.fixtures and finishing touches. Gocanes should have thought of that. But he didn't...
  3. PortvilleCane

    IPF- Progress Pics (OP Updated July 10)

    Old Construction Proverb: This project is going to be built whether you are here or not. You are a minor player in a prestige project. Who cares.
Back
Top